Service provider SLA:
- Most Imp –> Transition to new or internal process post contract termination
- Right to audit – imp
- To check uptime reports in SLA –> check Availability reports.
-
Database:
- Assurance on Database Referential integrity should be provided by reviewing –> Foreign Key Structure
- Referential entity in a RDBMS refers to the consistency between couple (linked) tables. Ref integrity is usually enforced by the combination of a primary key or candidate key (alternate key) and foreign key. For ref integrity to hold, any field in a table that is declared a foreign key should contain only values from a parent tables primary key or candidate key.
- Default configuration should be changed
- Concerning if DBA is performing OS patches as that should be done by System Admin
- DBA suggests that efficiency can be increased using De-normalization –> It results in Data Redundancy –> Normalization is a design or optimization process for RDBMS that increases redundancy
- Concurrency objective in DB –> Ensure integrity when 2 processes attempt to update same data
- GREATEST ASSURANCE of DATABASE INTEGRITY –> Table link/Reference checks –> Performing these checks detect table link errors (such as completeness and accuracy of the contents of db) and thus provide greatest assurance of database integrity.
- Database audit logs should be deleted other than DBA
- During maintenance of RDBMS –> several values of foreign key in a transaction table have been corrupted –> consequence –> Detail of involved transactions may no longer be associated with master data, causing errors when these transactions are processed
- In RDBMS with referential integrity –> the use of which of the following keys would prevent deletion of a ROW from customer table as long as customer number of that row is stored with live orders on the orders table —> FOREIGN KEY
- DENORMALIZATION – WILL INCREASE RISK OF —-> 🔥LOSS OF DATA INTEGRITY
- Which DB controls would ensure that the integrity of transactions is maintained in an online transaction processing systems database —> 🔥🔥COMMITMENT AND ROLL BACK CONTROLS
- User Spool and Database limit controls can affect the performances significantly.
- Database processing suddenly comes to a halt –> Integrity best ensured by –> Database commits and rollbacks**
- IT mgmt has decided to install RAD and remove off-site backups —> IT auditor should re-instate for off-site backups #readquestionproperly #understandmeaning #remove2options
- IS auditor sees corrupted data in database –> corrective control is –> 🔥🔥Data restore procedures
- Assurance on Database Referential integrity should be provided by reviewing –> Foreign Key Structure
- Auditor notices patches are deployed as per vendor –> MOST significant RISK would be that IT has🔥 not TESTED THESE PATCHES.
- For any changes done in business like – service provider change etc.. –> APPLICATION OWNERS SHOULD BE INFORMED.
- Auditor checking change mgmnt - Most imp control that IS auditor should look for to ensure system availability –> Test Plans and procedures exist and are closely followed
- 🔴🔥Disaster Recovery Plan - DRP (💥Addresses Tech aspect of BCP💥)
- Auditor reviewing DR PLAN –> Plan should PRIMARILY COVERS –> 🔥🔥🔥🔴🔴🔴💥💥ANALYSIS and PRIORITIZATION OF BUSINESS FUNCTIONS
- Downtime cost increases with time.
- 🔥Most Imp element to effectively execute a DRP –> Offsite storage of backup data
- Business Impact Analysis should be used in DRP for it to be successful
- 🔥NO TEST DONE IS CRITICAL – DRP –> auditor observed remote offices have very limited local IT resources –> MOST Critical –> is that 🔴no test is done to ensure that local resources could maintain security and service standards when recovering from a disaster or incident.
- Periodically Test - DRP – for continued compatibility of the contingency facilities
- Org recovery from disaster in which not all critical data was retained – > Issue with RPO
- Org DR plan - Auditor should Primarily verify that – regularly reviewed and updated
- Auditor reviewing DR of hot site used by financial institution –> Greatest Concern in this is –> Disk space Utilization data are not kept current –> without data of disks it can lead to a big disaster
- BEST Evidence of an org DR capabilities —> RESULTS OF TESTS
- 🔥MOST IMP to review when conducting – DR AUDIT –> DATA BACKUPS ARE Performed Timely and Stored Offsite
- Data Mirroring Strategy –> When Data doesn’t need be lost at all –> Hence RPO is low —> Low Data Loss –> Low RPO
- 🔥🔥🔥When reviewing DRP –> Auditor will be MOST CONCERNED with the lack of 🔴🔴PROCESS OWNER INVOLVEMENT
- IF Recovery TIME OBJECTIVE INCREASES –> 🔥🔥The Disaster Tolerance Increases –> it means if 5 days are required than company can tolerate upto 5 days of without business.
- DRP of a big org is changed and not tested –> Impact is catastrophic service disruption
- When developing DRP, the criteria for determining the acceptable downtime should be –> 🔥🔥MAXIMUM TOLERABLE OUTAGE
- BACKUP TECHNIQUES to use –> MOST appropriate when an org requires 🔴🔴EXTREMELY GRANULAR data restore points –> CONTINUOUS DATA BACKUP –> SHORT /LOW RPO –> Continuous backup – best option
- LOWER RECOVERY TIME OBJECTIVE —> HIGHER COSTS – 💥HOT SITE
- LOWER RPO –> Granular backup –> Continuous backup
- During DR test, auditor notes that server is slow –> 🔥Best possible scenario is to check the configuration of the server (if some unauth actions done on server, then check logs)
- GREATEST CONCERN when reviewing IT DR TEST —> 🔥🔥During test, some of the backup systems were DEFECTIVE and NOT WORKING – causing the test to FAIL
- Frequent updating of which of the following is key to the continued effectiveness of a DR plan —> 🔴💥Contact information of key personnel
- To address an org DR requirements, backup intervals should not exceed —> 🔥🔥RPO
- MOST EFFICIENT WAY TO DETERMINE EFFECTIVENESS OF THE DR PLAN ——> Efficient –> 🔥Preparedness test
- In a contract with a hot, warm, or cold site, contractual provisions should PRIMARILY cover –> 🔥🔥Number of subscribers permitted to use a site at one time🔥🔥
- MOST APPROPRIATE recovery strategy for a sensitive system with a high recovery time objective (RTO) —-> High RTO –High disaster tolerance –> 🔥Cold Site.
- For structured DR – MOST imp is that business continuity and disaster recover plan — > 🔥TESTED REGULARLY
- BEST METHOD TO ENSURE — critical IT system failures doesn’t recur –» PERFORM ROOT CAUSE ANALYSIS.
- Auditor reviewing most recent disaster recovery plan of an org –> WHOSE APPROVAL IS IMP when determining availability of system resources required for the PLAN ——– »> 🔥IT MANAGEMENT
- AFTER TABLE TOP —> NEXT STEP WOULD BE to be perform 🔥🔥FUNCTIONAL TESTS – which includes mobilization of the staff to exercise admin and org functions.
- TESTS FOR CO-ORDINATION in which relevant members participate –> Paper based test
- Prepared-ness test is performed by EACH local office to test the adequacy of the preparedness of local operations.
-
Business Continuity PLAN:
- Continuity Test Plan that simulates crash and uses actual resources to cost effectively obtain evidence —–> 🔥PREPAREDNESS TEST
- 🔴Designing BCP for airlines –> MOST APPROPRIATE method of data transfer/backup at an offsite location would be –> 🔥SHADOW FILE PROCESSING –> Exact duplicates of the files are maintained at the same site or at a remote site –> Two files are processed concurrently –> good for airlines. (hot sites takes time - like few hours)
- Most Imp in developing - BCP ——–»»> 🔥Process Owner
- MAJOR CONCERN for IS auditor –> Test results are not documented – Effectiveness of BCP can be best determined through tests
- PRIMARY OBJECTIVE of BCP test is –> Identify limitations of BCP
- IS auditor interviews key stakeholders in an org to determine whether they understand their roles and resp —> IS auditor is attempting to 🔥🔥evaluate the clarity and simplicity of the business continuity plans.
- During BCP – IS auditor noticed that the point at which Situation is declared to be a crisis has not been identified —-> MAJOR RISK associated with this is —> 🔥🔥EXECUTION OF THE DR PLAN COULD BE IMPACTED**
- WHICH BEST helps define disaster recovery strategies –> 🔥🔥MAX TOLERABLE Downtime and data loss
- After disaster declaration –> Media creation date at a warm recovery site is based on 💥🔥RPO
- Activation of an enterprise BCP should be based on pre-determined criteria —> that address the 🔥🔥🔴DURATION OF THE OUTAGE.
- MOST effective business continuity plan –> Planning involves all user departments
- Important to note that – Responsibility of declaring a disaster is very imp
- PRIMARY OBJECTIVE of BCP PROCESS —> is to 🔥🔥focus on managing and mitigating risk during recovery of operations due to an event that affected operations
- For acceptable time period for the resumption of critical business processes –> 🔥Both downtime costs and recovery costs need to be evaluated
- 🔴Unshielded twisted pair (UTP) cable for data communication over copper based has advantage of –> reducing crosstalk
- Method of routing traffic through split cable or duplicate cable is Diverse Cable (SC DC)
- To verify correct version of a data file used for prod –> Auditor should review SYSTEM LOGS
- 🔥🔥Best audit procedures to determine if unauth changes have been made to prod code –> is to 🔥Examine object code to find instances of changes and trace them back to change control records
- 🔴🔥IS auditor should review? to ensure servers are optimally configured to support processing requirements – SERVER UTILIZATION REPORTS
- 🔥Purpose of Code Signing is —–> 🔴Software has not been subsequently modified.
- 🔥When reviewing process for continuous monitoring of the capacity and performance of IT resources an IS auditor PRIMARILY ensure that process is focused on –> Accurate feedback on IT resource capacity
-
Business impact analysis (BIA)
- Best source of information for determining the criticality of application systems –> Business Process Owners
- PRIMARY PURPOSE of business impact analysis —-> Define recovery strategy
- 🔥Which of the following reports should an IS auditor use to check compliance with a service level agreement’s requirement for uptime –> Availability reports
- 🔥IS auditor use to determine if unauthorized modifications were made to production programs –> Compliance Testing
- 🔴MOST helpful when evaluating the effectiveness and adequacy of a preventive computer maintenance program –> System downtime log provides evidence regarding the effectiveness and adequacy of computer preventive maintenance program
- 🔥Online pooling tool to monitor and record application outages is the best option for an org to monitor the software as a service application availability.
- 🔴Help Desk Function –> is a service oriented unit –> End users must be advised before an incident can be regarded as closed
- POS –> centralized communication processor for connecting to the banking network. Best DR plan –> Alternative standby processor at another network node would be the best solution. The unavailability of the central communications processor would disrupt.
- Evaluating programmed controls over password management, which of the following is the IS auditor MOST likely to rely on –> **Validity check would be the most useful for the verification of passwords because it would verify that the required format has been used - for example not using dictionary word.
-
Reciprocal Agreement:
- GREATEST RISK of reciprocal in different companies – Developments may result in h/w and s/w incompatibility.
- GREATEST RISK in reciprocal of same business units –> Affected by same disaster risk – same incident.
- Reciprocal MITIGATION OF RISKS –> Ensure that partnering organizations are separated geographically
- Most effective in ensuring that production code and object code are in sync –> Date and timestamp reviews of source and object code
- Most Effective to detect malicious activity in production program –> Review of system log files
- Recovery procedures for an Information processing facility – BEST BASED ON –> Recovery Time Objective
- Maximum Tolerable Outage –> amount of time allowed for the recovery of a business function or resource after a disaster occurs: represents a time by which the service must be restored
- 🔵Capacity Management
- Primary benefit of IT Manager monitoring technical capacity –ensure that SLA req are met. Capacity Management has several objectives –> MAIN IS SLA REQ
- Change Control Process
- Most efficient way to test effectiveness of change management process —> Perform end to end walkthrough of the process
- IS auditor noted a system crash caused by security patch –> To provide assurance this wont happen again, auditor should –> change management process is adequate
- For proper SOD –> developer should have access to development only – any code change should be again done as part of the development cycle
- Reporting and responsibility lines cannot always be established when auditing automated systems because —> ownership is difficult to establish where resources are shared
- Library control S/w —> Main objective of Library control s/w is changes have been authorized
- Auditor examining the security config of an OS should review –> parameter settings
- In Open Source s/w –> Identify and test suitable patches before applying them
- Main Criterion for determining the severity level of a service disruption incident is ——»> 🔥DOWNTIME
- Performing preventive maintenance on electrical systems can result in unexpected downtime during office hours.
- During recent app development –> auditor noted that sla was miss due to incorrect priorities –> Support model was not properly developed and implemented
- GREATEST RISK WHEN SERVER STORAGE IS NOT MANAGED PROPERLY —> 🔥🔥Server recovery work may not meet the recovery time objective
- FIRST STEP in the execution of a problem management mechanism should be —->🔥🔥 Exception Reporting
- RAID LEVEL — PRIMARY PURPOSE —-> 🔥Ensure Availability of data
- Important consideration in providing backup for online systems –> Ensuring periodic dumps of transaction logs.
- Supervisory approval and review of critical changes by the accountable managers in the enterprises are required to avoid and detect any unauth change.
- Incident response team –> should handle this first after a major incident in a facility –> 🔥💥💥Containment at the facility
- SERVICE DELIVERY OBJECTIVE – SDO –> is the 🔥level of service to be reached during the alternate process mode until the normal situation is restored. This is directly related to the business needs.
- Configuration mgmt database (CMDB) – is used to track configuration items - CI. OUT OF DATE CMDB in a large MNC could result in incorrect approvals
- Incremental backup –> When first time full backup thereafter daily backup only –> MOST APPROPRIATE WHEN THERE IS LIMITED MEDIA CAPACITY
- What MITIGATES the best – risk of backup media containing irreplaceable information being lost or stolen in transit —> DUPLICATE COPY
- Emergency changes can be approved later on – after the activity is finished
- MOST efficient strategy to backup large quantity mission critical data that needs to be supported 24hours a day –> implementing a fault tolerant disk to disk backup solution
- For PATCHES ensure 🔥🔥APP OWNER and 🔴🔴DATA OWNER ARE aware of the same and their approvals are taken.
- Emergency changes are done when —> there is a high probability of significant impact on operations.
- For Emergency changes, best accountability for the support personnel is to create a specific individual support ID – when required – later on to be deleted.
- Automated tool can immediately provide a report which patches are running and applied
- BEST ensures accountability when updating data directly in a production database —> 🔥🔥Review of Audit Logs
- Performance criteria for the authentication servers would be helpful to evaluate thresholds of the system performance
- MOST effective control for enforcing ACCOUNTABILITY —> Implement a log management process